// you’re reading...

CCIE

Cables, cables, and more cables

I’ve spent the last few days getting the rack all wired up and the terminal server working. It looks like I have an issue with my terminal server (2511) not working on some of my TTY lines. I have contacted CiscoKits, which is sending a return mailing address label to me, so I can ship the unit back for inspection. Hopefully they find the same issue and it can be resolved. Kind of sucks, that postpones me using the 2511- which is a pain in the butt for larger labs, but that’s OK. For the tech labs, I’ll mostly need only a couple of routers anyway, so I can deal with moving the console cable in the meantime.

Anyway, I’m getting all of the CAT5 cable made. I’m making it all myself, to save money, and to have the cables at the proper lengths. Nothing annoys me more than seeing a rack with 20 ft of extra CAT5 when that’s not necessary. I kind of understand on serial cables..mine are longer than they need to be also, but let’s at least do a LITTLE cable management people. That being said, there’s gotta be a limit, because if you’re anything like me, you move cables around sometimes, and try new things, which is great. We’re not building a permanent rack here, it’s for training purposes- but using that as a reason to not use cable management is kind of a cop out! That aside, to some extent, I expect CCIE racks to be kind of messy, that’s part of the game..just not overly messy ;)


Back to making the CAT5. I haven’t gotten much studying done since I’ve been busy getting the rack up in order to do IEWB Vol I again. I will surely post more once I make some process whether it be on the rack or my personal studies for the written.


Discussion

Comments are disallowed for this post.

Comments are closed.